Submitting your PMC Report
There are three ways to submit the Professional Maintenance and Certification
(PMC) report.
Microsoft Excel:
This version of the PMC report is an Excel spreadsheet with linked
cells. To download and use a copy of this report, right-click here and
select "download file" or "Save Target As". It is important that you do not
try to run this file from its present location, as that will not work and might
cause your report to become unstable. Please note that some of the cells are password
protected. If you need assistance on filling out this report, please contact
rharris@entsoc.org.
PDF:
You may also download a copy of the PMC report as a PDF by clicking here.
Microsoft Word:
This version of the PMC report is an Word document, using
Tables. To download and use a copy of this report, right-click here and
select "download file" or "Save Target As". It is important that you do not
try to run this file from its present location, as that will not work and might
cause your report to become unstable. If you need assistance on filling out this report, please contact
rharris@entsoc.org.
The report is due on March 15th of the year
following the third year covered in the report (e.g., a report due on March 15th,
2007 would cover 2004, 2005, and 2006). For new BCEs, if you were certified in
the first half of a year, your "start date" for accumulating continuing
education unites (CEUs) would be January 1st of that year. If you were certified
in the second half of the year, your start date for CEUs would be January 1st of
the following year. Your PMC report should be submitted to the following
address:
ESA Certification
Coordinator
Entomological Society of America
c/o Wachovia Bank
P.O. Box 758954
Baltimore, MD 21275-8954
703-234-4121 (p)
703-435-4390 (f)
bce@entsoc.org